Using Heuristics to Derive Pre and Trigger Conditions Show in detail how the heuristics in Section 12.6.1 can be used to derive systematically the required pre- and trigger conditions on the train control operations in Figure 12.6Answer should be 1-2 paragraph..Refer 12.6.1 in requirements engineering textbook here https://bookshelf.vitalsource.com/#/