Description Hello, The test plan is attached, and the comment is Hello Darry, Professor replied to this assignment and said: “sample collection – should state what is being done at this time [ie containerized gas]; section 2.2- should include testing full system with air prior to introduction of gas – conduct leak checks of system using bubble water as example [confirm no leaks]; what will you do in the case that you see or determine that there is a problem; at this juncture- until project proven would remove flue gas sample from testing; test/pass fail criteria should be what would you consider as passing for this process/procedure to be successful [% recovery] and what would you consider to be a failure of the system”