The following data have been recorded for recently completed Job 450 on its job cost sheet. Direct materials cost was $2,127. A total of 32 direct labor-hours and 256 machine-hours were worked on the job. The direct labor wage rate is $20 per labor-hour. The Corporation applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is $27 per machine-hour. The total cost for the job on its job cost sheet would be: