Job 910 was recently completed. The following data have been recorded on its job cost sheet: Direct materials$2,454 Direct labor-hours 71labor-hoursDirect labor wage rate$15per labor-hourMachine-hours 137machine-hoursThe Corporation applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is $16 per machine-hour. The total cost that would be recorded on the job cost sheet for Job 910 would be: