Background: Hugh Generic of Generic Financial Services has hired XYZ Systems Consulting to help with the LAN design of two offices. Mary Prince of XYZ Systems Consulting met with Hugh Generic and a transcript of their conversation can be found in the student download section on the right within the XYZ Systems Consulting folder.Assignment:Prepare a LAN design using Visio® for service request SR-mf-005 & SR-mf-007 in the PDF files attached
ntc409v3_xyzsystemsconsulting_sr_mf_005_007.pdf

Unformatted Attachment Preview

College of Information Systems and Technology
XYZ SYSTEMS CONSULTING
SERVICE REQUEST: SR-mf-005 LAN Design- Boise Office
Requester
Description
Hugh Generic
Create a Requirements Document and a Logical Design for the LAN for
Generic Financial’s Boise office.
Location
Boise, ID
Background
Generic Financial has completed the tenant improvements on its Boise, Idaho office and is
getting ready to formally open its office there. Mary Prince met with Hugh Generic and
discussed the company’s needs. A transcript of the conversation can be found in the student
area. A formal requirements document and a logical design, based on Hugh and Mary’s
conversation, need to be prepared and approved before work on the network can
proceed.
Ex pected Results
A Network Requirements document. A Logical Design for the LAN.
College of Information Systems and Technology
XYZ Sy st ems Consulting: SERVICE REQUESTS: SR-mf-005 and SR-mf-007
U nauthorized use, duplication and/or distribution of the content contained in this document are hereby prohibited without the written consent of Apollo
Educat ion Group, Inc. ©2015 Apollo Education Group, Inc. Copyrights are retained by their owners.“
1
College of Information Systems and Technology
XYZ SYSTEMS CONSULTING
SERVICE REQUEST: SR-mf-007 LAN Design- Sioux Falls Office
Requester
Description
Hugh Generic
Create a Requirements Document and a Logical Design for the LAN for
Generic Financial’s Sioux Falls office.
Location
Sioux Falls, SD
Background
Generic Financial has signed a lease for its Sioux Falls office. Tenant improvements will begin
in the next few weeks. Mary Prince met with Hugh Generic and discussed the company’s
needs. A transcript of the conversation can be found in the student area. A formal
requirements document and a logical design, based on Hugh and Mary’s conversation,
need to be prepared and approved before work on the network can proceed.
Ex pected Results
A Network Requirements document. A Logical Design for the LAN.
College of Information Systems and Technology
XYZ Sy st ems Consulting: SERVICE REQUESTS: SR-mf-005 and SR-mf-007
U nauthorized use, duplication and/or distribution of the content contained in this document are hereby prohibited without the written consent of Apollo
Educat ion Group, Inc. ©2015 Apollo Education Group, Inc. Copyrights are retained by their owners.“
21

Purchase answer to see full
attachment