***Assignment Instructions:
***All I need from you is for you to review the Project Budget for accuracy and to revise/correct the Project Budget if any inaccuracies are found.***
Additional Requirements:
Complete the assignment using your own words with correct spelling, punctuation, and grammar in APA format. No plagiarism.
If you are not using your own words or if you are quoting any information or definitions, make sure to cite the information by using proper APA format citations and don’t forget to include the source of the information as a reference on the references page by using proper APA format.
Read and use the attached PDF, Word, and/or Power Point document(s) that are attached to this question in order to understand the necessary information in order for you to be able to complete the assignment accurately and completely.
Read and use any other files that are attached to this question in order for you to be able to complete the assignment accurately and completely, if applicable. Do not forget to include any other attachments as references and to use citations from them, if applicable.
Original Project Instructions (Just For Reference):
Resources: Project Charter and Preliminary Project Plan, both of which were created by the Learning Team in Week 2
Prepare a final Project Plan by reviewing and revising the preliminary project plan for the Learning Team’s selected project.
Use the requirements defined for the Preliminary Project Plan completed in Week 2.
Summarize the milestones and tasks that must be accomplished to achieve the project goals. Include a discussion of the critical path.
Use Microsoft®Project to develop a high-level Work Breakdown Structure (WBS) detailing tasks, dependencies, resources, and the critical path.
Include the Microsoft®Project Gantt chart, the network diagram, and a resource list as an attachment to the Project Plan. Also, include a copy of the budget, which may be done in either Microsoft®Excel or Microsoft® Project.
Format your Project Plan using any standard project management applications such as Microsoft® Project.
20160918192612___preliminary_project_charter_worksheet___team_b.doc

Unformatted Attachment Preview

Preliminary Project Charter Worksheet
1
Preliminary Project Charter Worksheet
Instructions: Complete this project charter worksheet according to the instructions in section 4.1
of A Guide to the Project Management Body of Knowledge.
1. Project title: Complete Demolition of Union Tribune Building
2. High-level project scope (less than 50 words)
The project deliverables include removal of all interior fixtures, and furniture prior to complete
demolition of building. The building is six story’s high and has a multitude of interior
items such as desks, chairs, counters, and an exercise facility made from a total of 200
rooms.
3. Problem to be solved or opportunity to be realized by this project (less than 25 words)
Problems will include how to remove existing fixtures from the building that won’t fit down
service elevator. Also, how long will it be till we have access to each of the floors/rooms
as there are employees still working in some of the rooms.
4. Project purpose or justification including specific measurable business impacts or results
(less than 50 words)
The purpose of this project is to get each floor down to nothing except columns and clear and
level cement floors, as the owner wants to sell the building as soon as possible. We can
measure how long it will take to completely clear an entire floor and have it ready to show
possible investors/buyers.
5. Measurable project objectives and related success criteria including metrics (Provide three to
four objectives with metrics)
Measured objectives include estimates of time to remove interior fixtures, time to demolish all
stationary objects, and the amount of time it will take to have an entire floor ready. Using
these objectives we can determine how much it will cost to remove and demolish,
resources required to complete the work, dumpsters required, and rental equipment
needed in order to have an entire floor ready.
6. High-level requirements (less than 100 words)
These requirement are making sure the supervisors are well trained and can handle separate
crews working in multiple areas of the building simultaneously. It is essential for the
project team to remain on schedule or close to on-time delivery for inspection by new
buyers. The current owner is losing money each day the building is unoccupied.
7. High-level risks (less than 100 words)
Risks are huge. They include shortage of man power as we will need close to 100 men
working daily until close to project completion. There is risk of rental delays, weather
forcing work stoppage, and possible employee injuries.
8. Summary of high-level milestones schedule (identify the major deliverables and subtasks)
High level milestones include time it will take to remove all interior fixtures from one room and
then from the entire floor completely. From there a high milestone includes time to
Preliminary Project Charter Worksheet
2
demolition all stationary equipment. And then the biggest milestone, is to demolish the
entire floor down to columns with a leveled cement floor.
9. Summary of high-level budget including expense dollars, capital dollars, and headcount
(identify costs for major deliverables and tasks identified in the preceding milestone schedule)
The initial contract value of this job starts at $2.5 million simply for the demolition and removal
of all stationary fixtures and interior furniture. This costs doesn’t include any unforeseen
objects or the cost to level the cement floors.

Purchase answer to see full
attachment